The Quality Control Procedure is divided into 3 major categories.
Inspection and Testing shall be done for all the products / Equipment in accordance with Quality Assurance Plan. The inspection and Testing shall be in 3 stages as follows :
This is normally carried out on receipt of material at works for conformance of specified requirements as per the drawing and technical specifications. The materials shall be released for production on verification of accompanying documents. This is to permit immediate recall and replacement in the event of non-conformance of specific requirement. Also samples shall be taken from each lot at random, for testing the Chemical Analysis and Physical Properties of the same, which shall be normally done for special type of Alloy Steel.
In process Inspection shall be carried out as per the Inspection and Testing plan.
Product acceptance will be determined by the acceptance criteria laid down in the specification and the Test plan.
Manufactured products shall not be released for further processing until all the required inspection and tests are completed or the necessary reports are verified.
All the manufactured / bought out items shall undergo final inspection in accordance with the specified contractual requirements prior to despatch, with the consent of client. All Final Inspection and Testing shall be carried out in accordance with the Inspection & Testing Plan.
Manufactured items shall be accepted when :
No manufactured items shall be despatched until all the activities specified in the Inspection and Test Plan have been satisfactorily completed.